This petition was submitted during the 2010-2015 parliament
Petition Require transmission companies to justify why pylons should be built above ground
More details
Electricity pylons are defacing Great Britain's beautiful countryside, and perhaps harming the health of those who live near them. The whole-life cost of burying transmission cables may not be much different from building above-ground. Transmission companies should be required by the regulator to justify why they should transmit electricity above ground. The default should be to bury transmission lines.
This petition is closed This petition ran for 6 months
9 signatures
Show on a map the geographical breakdown of signatures by constituency
10,000 signatures required to get a government response