Important:

This petition was submitted during the 2010-2015 parliament

Petition Put wind turbines on the top of all new electricity pylons

More details

The National Grid are currently running a competition to design new pylons with the aim of renewing the 88,000 pylons throughout the UK.

I propose that they be required to put wind turbines at the top of each of those.

This petition is closed This petition ran for 6 months

4 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response