This petition was submitted during the 2010-2015 parliament
Petition Motorway Construction Procedure
More details
Petition for a change in the procedure in which motorway roadworks take place.
The current system leaves a vast expanse of unattended roadworks, leaving areas cordoned off without any plans for construction in the short term, possibly leaving them for weeks or months without use.
This petition suggests; the breaking down of roadworks into shorter segments to prevent the unnecessary congestion caused by the feeding of 3 lane traffic into 2 lanes, the ending of misallocation of speed cameras and the lowering of speed limits for the protection of an absent workforce.
This petition is closed This petition ran for 6 months
4 signatures
Show on a map the geographical breakdown of signatures by constituency
10,000 signatures required to get a government response