Important:

This petition was submitted during the 2010-2015 parliament

Petition cessation of windfarm construction within UK

More details

It has been argued, that in the case of wind power the latter far outweigh the former. Wind turbines cannot generate enough energy to reduce global CO2 levels to a meaningful degree; Also wind power is by nature intermittent and cannot generate a steady output, necessitating back-up coal and gas power plants that significantly negate the saving of greenhouse gas emissions.

In addition to the inefficacy of wind power there are ecological drawbacks, including damage to habitats, wildlife and the far-from-insignificant aesthetic drawback of the assault upon natural beauty and the pristine landscape, which wind turbines entail. Wind power has been, and is being, excessively financed at the cost of consumers who have not been consulted, nor informed that this effective subsidy is being paid from their bills to support an industry that cannot be cost efficient or, ultimately, favour the cause it purports to support.

This petition is closed This petition ran for 6 months

114 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response