Important:

This petition was submitted during the 2010-2015 parliament

Petition Reopen The Lincolnshire Loop Line - Lincoln to Boston

More details

I want them to carry out a feasibility study on this former railway line that will be needed in the future, we can't go without having our trains for much longer and this route will need to come back into full operations in the future without a doubt in sight. They need to carry the study out in order to determine the cost of reopening the line for passenger and freight traffic once again because it can be done. The line has been gone for far too long now and needs to make a comeback pretty soon.

This petition closed early because of a General Election

21 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response