Important:

This petition was submitted during the 2010-2015 parliament

Petition Reversing Beeching - The New Line

More details

I would like someone to draw up a feasibility study on this line from Coningsby all the way to Midvile, I know the trackbed between the two platforms at Tumby Woodside is heavily overgrown but if the line was to ever come back then obviously the overgrowth would need to be cleared.

This petition closed early because of a General Election

3 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response