This petition was submitted during the 2015 to 2017 Parliament
Closed petition Remove the plutonium stockpile at Sellafield by using the PRISM fast reactor
Closed on
There is over 100 tonnes of plutonium in storage at Sellafield. It costs the taxpayer £80 million a year to store. The stockpile is a potential danger to the public.
A new nuclear reactor called PRISM could consume the plutonium as fuel, providing clean energy whilst eliminating nuclear waste.
The PRISM is a type of nuclear plant called a fast reactor. It is different to other nuclear reactors in operation today in that it uses fast neutrons. The fast neutrons allow the reactor to consume nuclear waste (including plutonium) as fuel.
PRISM could be built at Sellafield to consume the stockpile of plutonium located there. The reactor would consume plutonium whilst producing low carbon power.
This would also create high-tech jobs and improve the UK technical capability
53 signatures
Petition progress
View all updates for this petition, with the most recent first.
-
Petition closed
-
Petition published
This petition can now be signed.
If this petition gets 10,000 signatures, government will respond to it.
If this petition gets 100,000 signatures, it will be considered for debate in Parliament.
This petition will stay open until 20 May 2016.