Important:

This petition was submitted during the 2015-2017 parliament

Petition Department of Transport to look into the service run by Abellio Greater Anglia.

Today train services were severely disrupted by overhead power cable failures. Even though Network Rail maintain these, the rolling stock is beyond fit for purpose with passengers sweltering in carriages.

This petition is closed This petition ran for 6 months

2,158 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response