This petition was submitted during the 2015-2017 parliament
Petition Build HS2 up to an expanded Doncaster Sheffield Airport (DSA)
DSA is soon to be linked to the M18 a new dual carriageway, the A1 being one junction along the M18 and the M1 only three junctions away. There is a "lot" of room available for an extra runway, new train station/terminal/parking. DSA has one of the longest runways in the UK.
More details
Currently a train journey from London Kings Cross to London Heathrow takes 51 mins. The fastest train from Kings Cross to Doncaster is 95 mins using existing lines and railway stock, this could be vastly reduced if HS2 were to be built in this direction noting that DSA is also 6 miles South of Doncaster station, giving an extra reduction in transfer time.
Expansion can then be progressed in the North via HS3 and the proposed road route across the Pennines to Manchester.
This petition is closed This petition ran for 6 months
46 signatures
Show on a map the geographical breakdown of signatures by constituency
10,000 signatures required to get a government response