This petition was submitted during the 2019 to 2024 Parliament
Closed petition Continue to run through trains from Bristol to Waterloo via Trowbridge
Closed on
The Department for Transport has specified that the direct trains from Bristol, Keynsham, Bath, Bradford-on-Avon and Trowbridge to London (Waterloo) via Salisbury cease in December (2021). We ask that they continue to run pending consultation and effective ongoing provision.
This is a well used service. No practical alternative is available or offered. It provides the only through trains from London to Trowbridge, Bradford-on-Avon, Oldfield Park and Keynsham. It provides the only through services from Bristol and Bath to South London. It connects to much of the South East. It provides much needed extra capacity
The future service might run as an extension of MetroWest services. This should be done with consultation.
6,572 signatures
Petition progress
View all updates for this petition, with the most recent first.
-
Petition closed
-
Petition published
This petition can now be signed.
If this petition gets 10,000 signatures, government will respond to it.
If this petition gets 100,000 signatures, it will be considered for debate in Parliament.
This petition will stay open until 7 April 2022.