Important:

This petition was submitted during the 2010-2015 parliament

Petition Extend the Metrolink to Bolton.

More details

Extend the Manchester Metrolink to Bolton via Kearsley and Farnworth..

This petition is closed This petition ran for 6 months

11 signatures

Show on a map the geographical breakdown of signatures by constituency

10,000 signatures required to get a government response